Public Sector Decarbonisation Guidance: Standard scope of works for Feasibility and Design studies (XLS)

This tool will help you produce first draft specifications for feasibility and design studies.

Guide
Template
Toolkit

This resource is part of a collection

Print Email Share URL LinkedIn

This guide is designed to assist public sector organisations to draft comprehensive scope of works for the inclusion in tender specifications for heat decarbonisation planning. The scope of works is crucial for contractors to make precise bids for competitive contracts. By following this guide you can be more confident that your specification will accurately reflect your requirements. Please visit the Catapult's Public Sector Decarbonisation Guidance website to access more knowledge and toolkits, all of which are free to download. For many public sector organisations, decarbonising their heat requirement is likely to be the biggest challenge when it comes to their estate.

Heat decarbonisation planning is about how you transition your heating systems from fossil fuels to low-carbon alternatives, taking a holistic, whole building approach. This toolkit breaks-down six different activities a public sector organisation might explore in planning the decarbonisation of heat: 

  1. Desktop assessment
  2. Building audit
  3. Specialist survey
  4. Feasibility studies
  5. Investment Grade Audit
  6. Detailed designs 

Your project may require one of the above activities, or many working in combination with each other. This would mean downloading multiple specifications from this toolkit to combine as part of one procurement exercise. 

This toolkit provides template scope of works for each of the six activities that can be lifted and edited for inclusion in your own procurement processes, to help ensure that you achieve the best outcomes for your project. 

The standard specifications generated by this toolkit are designed to be comprehensive but each decarbonisation plan is different and should be made specific to your site and your project requirements. There might be specific deliverables or terms that you wish to remove from the specifications because they are not relevant to your site or project. You may also wish to add in additional requirements not covered in these specifications. 

You should develop your tender specifications in collaboration with stakeholders across your organisation who have detailed knowledge of the buildings covered by your scope of work, so that the specification fully captures your requirements, and the information you will provide to the contractor can be made available. 

Please make sure that you check any final tender documents with your own internal procurement team to ensure that you are meeting internal procurement requirements. 

ESC is making this report available under the following conditions. This is intended to make the Information contained in this report available on a similar basis as under the Open Government Licence, but it is not Crown Copyright: it is owned by ESC. Under such licence, ESC is able to make the Information available under the terms of this licence. You are encouraged to Use and re-Use the Information that is available under this ESC licence freely and flexibly, with only a few conditions. Using information under this ESC licence Use by You of the Information indicates your acceptance of the terms and conditions below. ESC grants You a licence to Use the Information subject to the conditions below. You are free to:

  • copy, publish, distribute and transmit the Information
  • adapt the Information
  • exploit the Information commercially and non-commercially, for example, by combining it with other information, or by including it in your own product or application.

You must, where You do any of the above:

  • acknowledge the source of the Information by including the following acknowledgement: “Information taken from Business models and complementary funding mechanisms to support heat pump deployment, by Energy Systems Catapult”
  • provide a copy of or a link to this licence
  • state that the Information contains copyright information licensed under this ESC Licence.
  • acquire and maintain all necessary licences from any third party needed to Use the Information.

These are important conditions of this licence and if You fail to comply with them the rights granted to You under this licence, or any similar licence granted by ESC, will end automatically.

Register to access the full article

Designed to aid Local Authorities in developing robust, evidence-based plans to enable Net Zero.

Register now

Already have an account? Login

Free UK Local Authority access

Register now
  • Guest preview of selected publicly available resources
  • Full library of 1,000+ articles
  • CPD accredited e-learning courses
  • Case studies
  • Discussion forum