Public Sector Decarbonisation Guidance: Building fabric intervention estimator

This estimator is designed to support the assessment of site building fabric and give an understanding of relevant energy consumption building by building on either a campus style site or at an organisational portfolio level.

Calculator
Data models
Template
Worksheet

This resource is part of a collection

Print Email Share URL LinkedIn

This estimator is designed to support the assessment of site building fabric and give an understanding of relevant energy consumption building by building on either a campus style site or at an organisational portfolio level. Using this estimator also provides a repository of site information to be assembled in a consistent format.

This guidance is produced  as part of the development of a consistent approach to assessing decarbonisation for scaled delivery. It provides an assessment of the impact of building fabric on a given site's energy usage, by focusing on understanding the current building construction and condition, and estimating expected financial and energy savings potential from upgrades.

This tool can be used standalone or as part of the Public Sector Decarbonisation Guidance feasibility and design process (see link below)  to assess the impact of building fabric within a decarbonisation plan.

Building fabric costs and benefits are particularly hard to estimate without detailed building surveys. They are often also the most challenging efficiency measure to justify due to long pay back periods. Where a site heat solution needs some fabric measures implemented in order to be successful, consider adopting the following approach:

  1. Estimate the energy savings from an appropriate package of measures based on what the known current state of the buildings is (Building Breakdown tab). This should be defined building by building based on building age and use alongside any knowledge of post-build interventions (such as double glazing)
  2. Compare the estimated total cost of interventions (given on the Fabric Changes tab) with an estimated cost at which the Internal Rate of Return (IRR) = 0%
  3. The 0% IRR cost can be taken as the amount that the site would need to find from its own budget. The difference between this and the total cost would then require some form of grant/gap funding to bridge the gap between the two figures and ensure the interventions are taken forward     

ESC is making this report available under the following conditions. This is intended to make the Information contained in this report available on a similar basis as under the Open Government Licence, but it is not Crown Copyright: it is owned by ESC. Under such licence, ESC is able to make the Information available under the terms of this licence. You are encouraged to Use and re-Use the Information that is available under this ESC licence freely and flexibly, with only a few conditions. Using information under this ESC licence Use by You of the Information indicates your acceptance of the terms and conditions below. ESC grants You a licence to Use the Information subject to the conditions below. You are free to:

  • copy, publish, distribute and transmit the Information
  • adapt the Information
  • exploit the Information commercially and non-commercially, for example, by combining it with other information, or by including it in your own product or application.

You must, where You do any of the above:

  • acknowledge the source of the Information by including the following acknowledgement: “Information taken from Business models and complementary funding mechanisms to support heat pump deployment, by Energy Systems Catapult”
  • provide a copy of or a link to this licence
  • state that the Information contains copyright information licensed under this ESC Licence.
  • acquire and maintain all necessary licences from any third party needed to Use the Information.

These are important conditions of this licence and if You fail to comply with them the rights granted to You under this licence, or any similar licence granted by ESC, will end automatically.

Register to access the full article

Designed to aid Local Authorities in developing robust, evidence-based plans to enable Net Zero.

Register now

Already have an account? Login

Free UK Local Authority access

Register now
  • Guest preview of selected publicly available resources
  • Full library of 1,000+ articles
  • CPD accredited e-learning courses
  • Case studies
  • Discussion forum