Energy Systems Catapult has identified a range of options for reducing the capital costs of rolling out low-carbon district heat networks across the UK, laid out in a report for the Energy Technologies Institute.

Report

This resource is part of a collection

Print Email Share URL LinkedIn

Energy Systems Catapult has identified a range of options for reducing the capital costs of rolling out low-carbon district heat networks across the UK, laid out in a report for the Energy Technologies Institute.

District heating, where all buildings within an area share a single heat source, has the potential to play a far greater role in the UK energy system. However, work must be done to help heat networks evolve. If fully exploited, nearly half of all heat demand could be met by heat networks.

Capital costs are the main barrier to progress in this area. However, we believe these proposals could reduce capital costs by up to 40%, rendering heat networks more attractive than other forms of low-carbon heat provision.

Eight cost-saving route maps

We have suggested eight ‘route maps’ designed to cut costs for district heating network deployment in the UK.

  1. Knowledge management research and training – Establish a District Heating Knowledge Centre to share learning and increase the impact of all other innovations. This knowledge centre would disseminate current best practice and outputs of other innovations, bringing together a wide group of stakeholders.
  2. Low flow rate design – Develop tools to help increase the accuracy of heat demand estimates and maximise the difference between temperatures entering and leaving the building.
  3. Radical routes – Reduce costs of civil engineering by running distribution pipes along the buildings themselves; either in the eaves or on the front. This is most effective in terraced housing but can be implemented cost-effectively in semi-detached areas.
  4. Trenchless technologies – Drill tunnels underneath the surface, removing the need for trenching. The technology for this already exists but key products need development to make it more cost-effective.
  5. Improved front-end design and planning – Demonstrate and quantify the positive impact of improved design work and surveying. This includes undertaking detailed survey and design work early, focussing on the activities that realise the greatest cost savings as well as adopting alternative contract frameworks to minimise the pricing of risk.
  6. Shared civil engineering costs – Share the costs of civil engineering between utilities working in the same region. This solution includes aligned planning cycles, developing a Streetworks Partnership, and joint ventures between district heating and utility companies.
  7. Direct heat interface unit system and existing hot water storage – Demonstrate the potential cost savings of replacing indirect with direct Heat Interface Units (HIUs) whilst making use of existing hot water tanks. This would include some product development to alleviate perceived risks to the consumer.
  8. Heat interface unit optimisation – Innovate to reduce the cost of HIUs for retrofit schemes from approximately £1,500 to £200.

Next steps

To enable innovations to reduce capital costs within heat network infrastructure, UK central and devolved governments need to provide frameworks that support demonstration, knowledge transfer and skill development in the sector.

Elevating heat networks to be included as infrastructure within the Infrastructure and Project Authority will give impetus for stakeholders to innovate. It would demonstrate that the government recognises that the need for and scale of our heat network development is a major infrastructure project.

ESC is making this report available under the following conditions. This is intended to make the Information contained in this report available on a similar basis as under the Open Government Licence, but it is not Crown Copyright: it is owned by ESC. Under such licence, ESC is able to make the Information available under the terms of this licence. You are encouraged to Use and re-Use the Information that is available under this ESC licence freely and flexibly, with only a few conditions. Using information under this ESC licence Use by You of the Information indicates your acceptance of the terms and conditions below. ESC grants You a licence to Use the Information subject to the conditions below. You are free to:

  • copy, publish, distribute and transmit the Information
  • adapt the Information
  • exploit the Information commercially and non-commercially, for example, by combining it with other information, or by including it in your own product or application.

You must, where You do any of the above:

  • acknowledge the source of the Information by including the following acknowledgement: “Information taken from Business models and complementary funding mechanisms to support heat pump deployment, by Energy Systems Catapult”
  • provide a copy of or a link to this licence
  • state that the Information contains copyright information licensed under this ESC Licence.
  • acquire and maintain all necessary licences from any third party needed to Use the Information.

These are important conditions of this licence and if You fail to comply with them the rights granted to You under this licence, or any similar licence granted by ESC, will end automatically.

Register to access the full article

Designed to aid Local Authorities in developing robust, evidence-based plans to enable Net Zero.

Register now

Already have an account? Login

Free UK Local Authority access

Register now
  • Guest preview of selected publicly available resources
  • Full library of 1,000+ articles
  • CPD accredited e-learning courses
  • Case studies
  • Discussion forum